I have a very small shop and I do not have any welding procedures or QC. I need to write these to pass an audit soon. I know I need to comply with Structural Welding Code – Steel AWS D1.1 , AWS D1.3 and AWS D1.4.

Where can I find an example of a factory procedure/s (not a Miller manual)...