Few pics of a Sno Bandit pusher box i repaired few weeks ago.Was pushing gussets thru back side from operator stacking snow i assume.Was about 14 deg.f when i did this plus a steady wind chill killing me.All 1/2" plate 7018 1/8 excalibur ran off my BB402D.
Announcement
Collapse
No announcement yet.
Sno Pusher Repair
Collapse
X
-
Ya, Tell me about the cold. I took on a job to rebuild a concrete plant, we had to reline all the bins with 1/4" AR 400 plate, repair the lacing on the trestle conveyor that 70' up, installing a new 30 hp motor at the top, changing seals in the gear reducer and all 14,000 lbs of material had to be carried through a 30" x 6' door, I think our warmest morning was 19 degrees and many well below zero.
2-1/2 weeks of this was a killer, This heat wave of near 30 is welcome.
Comment