A couple a few weeks ago I posted some pics in someone else's thread about railings, anyways I got an e-mail last night from a forum member asking to see the completed project.
Bad news is the builder is way behind schedule and all of the railings are not in place yet but I was able to get in the house and install the staircase railings. The top rails are going to have a piece of Cherry installed on top of them once they get the wood shaped the way they want it.
I can't do the outside deck railings yet because they haven't taken out the staircase yet or added the 4 foot to the width of it. I'll post the before pics of the deck and when they get around to finishing the deck I'll post the completed pics but, they are talking about being 6 weeks away from being ready for them.
The house also has three small decks off the back of the house that they had me measure out for a quote to replace the wooden railings with the same as the others I did. Dave
Bad news is the builder is way behind schedule and all of the railings are not in place yet but I was able to get in the house and install the staircase railings. The top rails are going to have a piece of Cherry installed on top of them once they get the wood shaped the way they want it.
I can't do the outside deck railings yet because they haven't taken out the staircase yet or added the 4 foot to the width of it. I'll post the before pics of the deck and when they get around to finishing the deck I'll post the completed pics but, they are talking about being 6 weeks away from being ready for them.
The house also has three small decks off the back of the house that they had me measure out for a quote to replace the wooden railings with the same as the others I did. Dave
Comment