If this is your first visit, be sure to
check out the FAQ by clicking the
link above. You may have to register
before you can post: click the register link above to proceed. To start viewing messages,
select the forum that you want to visit from the selection below.
I just got a new trailblazer 325. I have it on a full metal trailer.I ru the ground on the Pos. side connection and the stinger on the Neg. side connection. Is this ok?/ im not getting a smooth weld with any type or size rods I try. What is the best setup I should use to weld mostly up hill 7018 on post columns & w beams?? please help