we are doing robotic welding of fillet welds. general questions from a new inspector( i have heard different opinions) why is it theorically the best to push mig welds?
does the AWS D.1.1 code state anything specifically about maximum size or melt through maximums?
does the AWS D.1.1 code state anything specifically about maximum size or melt through maximums?
Comment