Originally posted by fencemaker
View Post
you got that right i always give myself a few extra hours just incase something goes wrong i think they just get that sticker shock when you tell them an hourly rate .i make radiator shrouds for freedom well srevices. a local fab shop give them a bid of 1500.00 a piece and i always give them a bid of 850.00 . the first one took me a day and a half because it was the first one the second two i built them in one 10 hour day by myself they also wanted a fan shroud to so i added 400.00 for the two shrouds they loved them and liked the price.they would have gotten off way cheaper if they would have just told me to make them and go the t&m rout. i'll take that 1250.00 a day anytime.