Some of my recent welding related work
Collapse
X
-
This was my most recent job. Floating mantle and hearth. Stone hasnt been installed yet. Stone mantle shelves will be installed around the rebar that is welded to the face of the c channel, and stone will sit in the bed of the hearth support. Stone will be flush with top of the c channel. All c channel was 45 miters, with blind welding only. So all visiable parts of the joint were just a shadow line. Ill get better pics of the joints next time im at that job.