I have taken out 2 horse stalls 12x12 each. I'm going add about 5 inchs of dirt and PAC it level and make storage and shelves. I would like to take that middle post out but trying to figure out how to brace that single 2x12 its about a 24 ft span I was thinking to use sq tubing drop down about 2 ft on the side posts and meet in the middle of the 2x12 but just not sure if that would do it.
It would make it easier to make the turn with the tractor bucket to put the dirt in there or lift something out if I need to.
It would make it easier to make the turn with the tractor bucket to put the dirt in there or lift something out if I need to.
Comment