Here is the job I wrote about in the other thread. Thought it was going to be some nice full pen gravy welds. Nope. The GC had to do a road cut and only had one day. The pipe was butted up and welded from the inside. No big deal, but it was already beveled for welding from the outside. Inspector said to make it air tight and thats it. OK Boss. We will do 3- 4 more joints later this week.[IMG]
[/IMG]
[IMG]
[/IMG]

[IMG]