Counting inches

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • calweld
    replied
    I don't count inches, my wife says I have plenty of inches!!

    Oh . . .

    Sorry


    Leave a comment:


  • Darmik
    replied
    Hey what about the pipeline that was going in between kitimat and Edmonton then back again? I know local 170 bid on that job i'm not sure if they won the bid but i'm pretty sure they did.then the whole thing got put on hold whats up with that?this was going to employ over 5000 jobs directly and indirectly.


    Darmik

    Leave a comment:


  • pipeline Dan
    replied
    union welders

    Originally posted by BigRed View Post
    Well I guess we will just have to go where no one else is willing to good to make the bike bucks. Hey Lynx, didn't you say they're pipeling at the north pole
    Ya I heard that as well but it seems like its all union stuff and you are by
    hand

    Leave a comment:


  • BigRed
    replied
    Well I guess we will just have to go where no one else is willing to good to make the bike bucks. Hey Lynx, didn't you say they're pipeling at the north pole

    Leave a comment:


  • BigRed
    replied
    I heard the price of natural gas was way down, so there is no big push for it. Alteast thats what I heard for BC. I doubt it has much to do with the rates, they make so much money of oil and gas that paying a guy 20 bucks less wouldn't be enough reason to slow all operations down. Atleast thats what I think. Like everything, shoulda been there last year.

    Leave a comment:


  • pipeline Dan
    replied
    Originally posted by Irwelder View Post
    Hi Dan,
    I still say the Oil companies are trying to get the price of services down by backing off on projects until they can get a lower price for labour , etc. .
    The biggest problem with the slowdown is that we have so many people that have gotten into the trade in the past few years. Nothing wrong with that, but when it gets slower rate cutting, etc. etc. happens..... there are reports of a few rig welders telling dispatcher's that they will work for way below the going rate just so they can work. Luckily they haven't been taken up on their offers ...yet.
    Ya thats the way it is aready going, Fort Mac is at 78 as compared too 2 years a go, cause nobody wanted to go and they where paying 100+. Now l
    see "welders" from out east will work for anything cause there's no work back home. I am all for guys doing better for their familes and coming here to work but dont come here and scr*w it for the rest of us I see it like this, They mabe only get say 40-50per hr back home, Come to Alberta for
    almost double that @ around 80. Stay for 6 months make your money and
    go home and sit on your ace for the rest of the year It shows what kind of guys they are cause they could be getting 115+ per hr but no lets scr*w over the guys that made that rate in the first place When I go get coffee from Timmys in the morning I see all kinds of trucks from out
    east. they are all loaded with wood tools and they them selves are grease *****, hailed out look'en guys and there building houses left right
    and center. Ya its funny cause Alberta Is the way it is today cause of hard work, drive, take'n a gamble kind of stuff and its all going down the drain as each day goes by. By the time the big dogs in the government catch on
    it will be too late and we'll be along time before it gets back to the way it
    was. I've heard of a few outfits that have had to pack it in already, just wait
    until springbreak up I think you'll see alot of companies start selling out

    Leave a comment:


  • Irwelder
    replied
    Originally posted by pipeline Dan View Post
    I ve always counted as 8" pipe= 8" . On a good day I am about 70-75" in a 10hr day But I do like Irwelders way cause that would mean I would get more
    inches in a day, at least on paper Its funny when guys boast about 130+ inches in a day(or so they say) cause we all get let go at the end of the job, thats when the real inches are laid on the table


    Irwelder where have you been? Your pockets must be full of coin If you've been work'en this whole time Is it slow up in GP? I know some guys from up there and the one guy(consultant) for Conaco philps says it will be a real dead sumer up their he says it wont fire again until next fall
    Hi Dan,
    For some reason my computer won't let me log in to the forum and I have been lurking the forum since October 2006. I decided to try my Kid's computer and I am able to log in from it, and that is how I was able to post today, finally.
    It is not overly busy up here right now. However there are many fellow welders not working. Fortunately, I have been working fairly steadily since Christmas and was very busy up until Christmas.
    Might pick up in awhile?? I still say the Oil companies are trying to get the price of services down by backing off on projects until they can get a lower price for labour , etc. That's my opinion anyway.
    Some of the consultants that I have known for years are saying that it will be even slower after this winter. Hopefully that info is incorrect but I guess all we can do is wait and see what happens. The biggest problem with the slowdown is that we have so many people that have gotten into the trade in the past few years. Nothing wrong with that, but when it gets slower rate cutting, etc. etc. happens..... there are reports of a few rig welders telling dispatcher's that they will work for way below the going rate just so they can work. Luckily they haven't been taken up on their offers ...yet.

    Leave a comment:


  • Terence638
    replied
    I have always concidered
    8" pipe equals 8" weld
    Then you take diameter X wall thickness + 20% clean up
    8" pipe with 1/2" wall thickness = 4 hours + 20% clean up = (+ - ) 40 minutes
    That would be for an Xray quality weld.
    Thats what I bid my work at.
    Hope this helps?
    Terence

    Leave a comment:


  • MMW
    replied
    Please note that this is not the actual inches of weld but just the way it is counted on a pipeline I'm assuming? To find the actual inches of weld you would multiply diameter x pi (3.1416) x amount of passes. An 8" pipe is approximatly 25" in circumference.

    Leave a comment:


  • pipeline Dan
    replied
    big inches

    Originally posted by Irwelder View Post
    Hi BigRed,
    In my experience inches have always been counted like this:

    Sch. 40 = nominal pipe size ( example 8" 40 = 8 inches of weld )
    Sch. 80 - 4" and up = 1.5 times ( example 6" 80 = 9 inches of weld)
    That is how most places that I have worked have counted them.
    I ve always counted as 8" pipe= 8" . On a good day I am about 70-75" in a 10hr day But I do like Irwelders way cause that would mean I would get more
    inches in a day, at least on paper Its funny when guys boast about 130+ inches in a day(or so they say) cause we all get let go at the end of the job, thats when the real inches are laid on the table


    Irwelder where have you been? Your pockets must be full of coin If you've been work'en this whole time Is it slow up in GP? I know some guys from up there and the one guy(consultant) for Conaco philps says it will be a real dead sumer up their he says it wont fire again until next fall

    Leave a comment:


  • Wicked one
    replied
    Originally posted by Irwelder View Post
    Hi BigRed,
    In my experience inches have always been counted like this:

    Sch. 40 = nominal pipe size ( example 8" 40 = 8 inches of weld )
    Sch. 80 - 4" and up = 1.5 times ( example 6" 80 = 9 inches of weld)
    That is how most places that I have worked have counted them.
    you sir are correct sch40 2" to whatever is nominal pipe size anything over sch40 is pro rated carbon is one thing stainless monel and inconel are more.

    Leave a comment:


  • Irwelder
    replied
    Originally posted by BigRed
    Wondering if I have this right. When counting inches sch'd 40 equals 1.5x's, and sch'd 80 equals 2x's.

    8" sch'd 40 pipe= 12"
    8" sch'd 80 pipe= 16"

    Correct?
    Hi BigRed,
    In my experience inches have always been counted like this:

    Sch. 40 = nominal pipe size ( example 8" 40 = 8 inches of weld )
    Sch. 80 - 4" and up = 1.5 times ( example 6" 80 = 9 inches of weld)
    That is how most places that I have worked have counted them.

    Leave a comment:


  • OldSparks
    replied
    Question is making sense now. Different world out there.

    Leave a comment:


  • 190MPH
    replied
    If you're talking about production, I've always been under the assumption that if its 8" pipe, its called 8" of weld. Interested to know if I've been giving them more than I had to all these years!

    Leave a comment:


  • OldSparks
    replied
    BigRed

    Not too sure of your question but check out this site for pipe dimension and respective schedule number.

    http://www.onlinepipe.com/pipechart.html

    Leave a comment: